Photo Gallery

57 photographs from the build, gathered in one place. Click any photo to open it full size, then use the arrow keys to move through the set.


2008

Delivery and first parts

The look we were after.
Earl of Southeastern Freight Lines backing into the loading dock.
Earl delivering the rear axle and front wheel assembly. Thanks Earl!
The chassis, rear axle and front wheel assembly waiting for Gary's truck.
From the big truck to Gary Scanga's truck: chassis, rear axle, front brace/spring/wheel assembly, 800 lbs. worth. Thanks Gary!!!
The nuts and bolts for putting it all together.
The front wheel assembly parts.

2009

Brake lines and the donor car

The donor car.
The Mustang 5.0 engine.

2010

Wheels, tires, engine, body

2012 – 2013

Insulation, paneling and paint

Back center paneling.
Dad painting the bottom.
Dad measuring the insulation.
Paul cutting.

2016

Loading up

Finished

On the road

The Paddy Wagon at City Hall.